Screeding a floor is an essential step in creating a smooth, level surface for tiling, carpeting, or other flooring finishes. Whether you’re working on a concrete subfloor, a garage, or a new extension, learning how to screed a floor properly ensures durability and a professional-looking result.
This guide will walk you through the step-by-step process of floor screeding, covering tools, materials, and essential techniques to achieve a perfectly level floor.
What is Floor Screeding?
Floor screeding is the process of applying a cement-based mixture to a concrete subfloor to create a flat and even surface. It is commonly used to:
✔ Prepare floors for tiling, vinyl, laminate, or carpets.
✔ Create a smooth base for underfloor heating systems.
✔ Correct uneven surfaces in old or new buildings.
Types of Floor Screed
There are different types of screed mixtures, each suited to different flooring needs:
1. Traditional Sand and Cement Screed
✔ Most commonly used screed.
✔ Made from a mix of sand, cement, and water.
✔ Requires manual leveling and finishing.
2. Self-Leveling Screed
✔ Flows easily and spreads evenly.
✔ Used for thin layers and smooth finishes.
✔ Ideal for underfloor heating.
3. Fast-Drying Screed
✔ Dries much faster than traditional screed.
✔ Can be ready for flooring within 24-48 hours.
✔ Useful for tight project deadlines.
Tools and Materials Needed
Before starting, gather the necessary tools and materials:
✔ Cement and sharp sand (for traditional screed).
✔ Self-leveling compound (if using a liquid screed).
✔ Mixing bucket or cement mixer.
✔ Straightedge or screed board for leveling.
✔ Trowel for smoothing edges.
✔ Spirit level to check for evenness.
✔ Measuring tape and marker.
✔ Protective gloves and goggles.
Step 1: Prepare the Subfloor
Before applying the screed, it’s crucial to prepare the surface properly.
-
Clean the floor thoroughly – Remove any dirt, dust, or debris.
-
Check for cracks or holes – Fill any gaps with a suitable filler.
-
Apply a primer or bonding agent – This helps the screed adhere properly to the surface.
-
Measure the floor thickness – Use a measuring tape and level to mark the required height.
A well-prepared surface ensures better adhesion and a long-lasting screed layer.
Step 2: Mix the Screed Properly
Getting the right mixing ratio is essential for a strong and durable screed.
For Traditional Sand and Cement Screed:
✔ Mix 1 part cement to 4 parts sharp sand.
✔ Gradually add water until it forms a semi-dry, crumbly texture.
✔ Avoid making the mix too wet, or it will shrink and crack when drying.
For Self-Leveling Screed:
✔ Follow the manufacturer’s instructions.
✔ Add the compound to water (not the other way around).
✔ Stir thoroughly with a mixing paddle to avoid lumps.
Step 3: Lay the Screed
Now it’s time to apply the screed to the floor.
-
Start at the furthest corner – Work your way toward the entrance.
-
Pour or spread the screed evenly across the floor.
-
Use a straightedge or screed board to level the surface.
-
Apply pressure to compact the screed, removing air pockets.
For self-leveling screed, pour it and allow it to flow naturally. You can use a spiked roller to remove air bubbles.
Step 4: Level and Smooth the Surface
Once the screed is laid, it needs to be leveled properly.
✔ Use a straightedge or spirit level to check for evenness.
✔ Adjust any uneven areas by redistributing the screed.
✔ Smooth the edges with a trowel for a clean finish.
For self-leveling screed, the liquid will naturally settle, but you should still check for levelness before it starts to dry.
Step 5: Allow the Screed to Cure
Drying and curing properly is crucial for a strong and durable screed layer.
Curing Time for Different Screeds:
✔ Traditional sand and cement screed – 7 days minimum before light foot traffic.
✔ Self-leveling screed – 24-48 hours depending on thickness.
✔ Fast-drying screed – Ready within a few hours to 24 hours.
Tips for Proper Curing:
✔ Keep the floor moist for the first few days to prevent cracks.
✔ Avoid walking on the screed until it has hardened.
✔ Do not place heavy objects on the screed while it’s curing.
Common Mistakes and How to Avoid Them
Even with careful preparation, mistakes can happen. Here’s how to avoid them:
1. Using Too Much Water
✔ A screed mix that’s too wet can lead to shrinkage and cracks.
✔ Always aim for a semi-dry, crumbly texture for traditional screed